Projects
Ausform's project experience has been in large and specialised engineering structures including mining process plants, freeway bridge construction, large reinforced concrete weirs and tank construction which rely on both specialist formwork design and precision concrete construction techniques.
Bendigo Multi Story Car Park
($5 M) to build the concrete super structure
La Trobe Rural Health School (LRHS) Project
Part 2:
Health Sciences Building (Flora Hill campus) ($1.8M) completion of structural (in situ) concrete works associated with the development of the Health Sciences Building.
Koondrook - Perricoota Flood Enhancement Works
Fulton Hogan
($2.3M) to undertake structural Concrete Works associated with regulators at Thule, Cow and Calf Creek.
Victorian Desalination Project
Victorian Government/Thiess Degremont Joint Venture
Ausform Pty Ltd currently hold the largest value sub-contract (approximately $16M) for structural concrete works on the $5 billion Project located at Wonthaggi in Victoria’s South East.
George Weston Foods Extension
Wiley & Co. Pty Ltd
More than 12 months worth of structural concrete works on the George Weston Foods Upgrade Project in Castlemaine
AbiGroup Contractors Pty Ltd
Nagambie Bypass
Construction of two twin bridges and a centre pier structure at two sites on the Nagambie Bypass Project in Central Victoria
East Goulburn Main Channel Off-Take Structure
Goulburn Murray Water/Future Flow/Geotechnical Engineering Pty Ltd
Construction of the East Goulburn Main Channel Off Tank Structure undertaken during the irrigation season shut down. A tight construction program, delivered ahead of time
Goldfields Super Pipe Project
Central Highlands Water/CCB Envico
Construction of 3 No. circular water holding tanks and associated pump station buildings
New Calder Freeway
Vic Roads/John Holland/Winslow Projects/Thiess
Construction of Five (5 No.) bridge structures on the New Calder Freeway between Carlsruhe and Harcourt North.
Bendigo Recycled Water Plant Upgrade (Epsom)
Coliban Water/CCB Envico
Construction of the Bendigo Recycled Water Plant Upgrade (Epsom) with works including the Chlorine Contact Tank, Recycled Water Wet Well, Low Lift Pump Station and Final Water Tank.
Bendigo Water Treatment Plant (Aqua 2000 Project)
Walter Construction Group./Coliban Water
Construction of the $80M Bendigo Water Treatment Plant (Aqua 2000 Project).
Bendigo Gold Project
Bendigo Mining Ltd/Ausenco Ltd
Construction of the $115M Bendigo Gold Project.
Fosterville Gold Mine Project
Northgate Minerals
Construction of the $90M Fosterville Gold Mine Project for Cullen Mining Services (mine now in operation by Northgate Minerals)
Numurkah Water Treatment Plant
Goulburn Valley Water/Simpson Construction Company
Design and Construction of a 3ML Round Clear Water Storage Tank at the Numurkah Water Treatment Plant.
Koorlong Waste Water Treatment Plant
Lower Murray Water/Fulton Hogan
Construct the $35M Koorlong Waste Water Treatment Plant, including a 120m long x 60m wide x 6m high SBR Tank and 8 other major miscellaneous RC structures.
Robinvale Pump Station Project
Lower Murray Water/Fulton Hogan
Construction of the $10M Robinvale Pump Station Project, including 30m long x 18m wide x 6m high pump station structure (ground water retaining)
Woodend Recycled Water Plant Upgrade
Western Water/Simpson Construction Company
Construct the $6M Woodend Recycled Water Plant Upgrade including a 31m long x 19m wide x 5m high recycled water tank (water retaining)
Pedestrian Rail Bridge
Victrack/Fulton Hogan
Construct the $3M Pedestrian Rail Bridge at Wandong
Sheahan Bridge Duplication
RTA/Fulton Hogan
Construction of the Sheahan Bridge in Gundagai. A 1.2km length bridge across the Murrumbidgee River Flood Plains.
Fosterville Gold Mine Upgrade
Northgate Minerals
Construction of the Heated Leach Facility at the Fosterville Gold Mine.
Colligen Creek Weir and Fishway Upgrade Project
State Water (NSW)/Gleeson Excavations
Construct the Colligen Creek Weir and Fishway Refurbishment
To whom it may concern,
I’d like to thank the Ausform team for the commitment to delivering their scope of works which included a complete bridge (Racecourse Road), two bridge abutments and a centre pier which are part of the Nagambie Bypass Project. Ausform’s commitment to quality and safety was excellent with the final product completed ahead of time.
Scott Brown
Ph: 0410 431 069
Senior Project Engineer / Abigroup Contractors Pty Limited
To whom it may concern,
I have recently been involved in the Construction of the Victorian Desalination Project. My responsibilities were overseeing works in the Pre-treatment area, including footings; walls tanks;. Suspended decks; the structural steel superstructure, Pre-cast tilt panels and the Green Environmental roof.
Ausform were awarded a portion of this work as a lump sum contract and also carried out a significant amount of on an hourly rate agreement. I found Ausform a pleasure to work with, their organisation within the company, their Planning and Safety Management was always of a high standard and they were an asset to the Thiess/Degremont Project during their time on site under difficult conditions.
They were supervised onsite by Matthew Carkeek and Clint Johnson both of whom led by example and displayed a considerable amount of knowledge and willingness to help us achieve the goals set by management. Regular visits to site by the Company Director, Brian Loughnane also assisted us in achieving our goals, by providing additional technical support and organising fabrication of equipment offsite to fast track progress. Ausform’s accounting system was always accurate and processed promptly with clear details of every employee’s activities daily. At all times, Ausform had an honest approach to the work performed.
However, after over 12 months onsite they had completed their contract work and unfortunately decided to return to Bendigo to carry out other contracts awarded to them. We certainly missed their expertise and attitude when they left.
I would not hesitate to recommend Ausform for any future work.
Laurie Bush
Ph: 0437 483 246
Superintendent Civil, Pre-Treatment
Wiley would like to thank Ausform Pty Ltd for their outstanding efforts on the George Western Foods, Castlemaine, Processing Plant Upgrade.
The concrete contract we agreed on, was a mixture of fixed contract lump sum and also agreed hourly rates on the more difficult work. This approach worked well for both parties. The total contract for the concrete work ended up at approx 2.5million.
Ausform's reliability to man-up when needed, quality of finish, attention to detail (which is very important in a food processing plant) was outstanding.
The nature of some areas of this project required intricate planning and night shift work to fit in with the client's requirements. All this work was achieved in the timeframes and to a very high standard of finish, with no planned disruption to our client. We could not have asked for a better result, due in no smart part to Ausform's efforts
Wiley would recommend Ausform for any work in Victoria and would be more than happy to use them again on future projects
Brent Allen
Project Manager
ph: 61 7 3859 8840
e: brent.allen@wirley.com.au
To whom it may concern,
Ausform Pty Ltd have been working for Thiess Degremont Joint Venture on the Victorian Desalination Project since February 2010. They currently hold the largest value structural concrete placement subcontract package on the project, an approximate value of $14M. To date their work and their work ethic has been excellent, which has resulted in them picking up much more work on the project than they had originally submitted a tender for. Their specialist knowledge of water retaining structures in particular has been invaluable on this project. I have no hesitation in recommending them and would be happy to answer any further inquiries.
Regards,
Joel Gabauer
Project Engineer / Thiess Pty Ltd
To whom it may concern,
Ausform has been working the past 7 months for Fulton Hogan on the Robinvale pump station and Koorlong Waste Water Treatment plant in Mildura. Value of works was approximately $7 million. Works are nearing completion. The works undertaken by Ausform are of a very high quality and the cooperation with the Ausform management team has been good and I can recommend them for any concrete / formwork works. Safety standard of compliance was high and no MTI / LTI was recorded. I am happy to discuss the above with anybody who is interested.
Regards,
Eric Waters / Senior Project Manager / Fulton Hogan Pty Ltd
We note our appreciation of Ausform's work on the recently completed project.
We found your Company excellent to deal with including your professionalism and workmanship - site issues were extremely limited and I believe the
finished product bears reflection of that - given the opportunity, I would be more than happy to deal with your Company again.
Director, Geotechnical Engineering Pty. Ltd.
Main slab has been complete.
Great job by Ausform yesterday in terrible rainy conditions.
We are now going through the boiler slab with J.Mconie and Daniel from Ausform to have complete by late January.
Cheers,
Troy Boyles
Surface Maintenance Superintendent / Northgate