Projects

Ausform's project experience has been in large and specialised engineering structures including mining process plants, freeway bridge construction, large reinforced concrete weirs and tank construction which rely on both specialist formwork design and precision concrete construction techniques.

 

Gisborne RWP, Gisborne, VIC

Service Streams Utilities.

Supply and installation of 3 No. water retaining structures as follows;
  • Bioreactor tank
  • MBR tank
  • Inlet Works

Packenham LCRP, Packenham, VIC

NWPA

  • East and west abutments, including lower deflection walls and upper deflection walls
  • Installation of abutment facia panels
  • Installation of retaining wall L panels, and associated in in situ stitch, grouting and caulking
  • Approach slabs and ballast walls
  • Misc stair foundations

Healsville Koo Wee Rup Rd Upgrade Project, Pakenham, VIC

McConnell Dowell

Construction of twin, single span super T bridges (integral abutments) including;
  • Abutments
  • Bridge deck(s)
  • Deck / abutment diaphragm stitch
  • Parapet installation and associated stitch
  • Approach slabs
  • Off structure barriers

Bryn Estyn WTP, Plenty, Tasmania

CPB UGL JV (TasWater Alliance)

Construction of major water retaining and other concrete structures including;
  • Pre-Treatment Tank (>6000m2 wall formwork, >6.5m high, >3000m3 of structural concrete, >800 tonnes of steel reinforcement
  • Backwash Tank and Interstage Pump Station Structure (>2800m2 wall formwork, >5m high, >1500m3 of structural, >350 tonnes of steel reinforcement)
  • UV Building
  • Ozone Tank
  • Pre Treatment Chemical Area

Koondrook Fishway and Weir Modifications Project, Koondrook, VIC

S&R Engineering and Construction for GMW

Construction of new Fishway Structure, and Modify existing Weir Structure >1500m2 of wall formwork, >140t of steel reinforcement and >600m3 of structural concrete

Mordialloc Bypass Project, Mordialloc

McDDJV

Construction of off structure barrier and gantry piles / pile caps for the entire Project

Edithvale Rd Level Crossing Removal Project, Edithvale, VIC

Southern Program Alliance - Acciona

  • Construction of >600 Lin m of retaining wall capping beam
  • Backwash Tank and Interstage Pump Station Structure (>2800m2 wall formwork, >5m high, >1500m3 of structural, >350 tonnes of steel reinforcement)
  • Construction of more than 500 Lin m of retaining wall capping beam in the Station area of the Project
  • Pile caps for the Pedestrian Bridge
  • Edithvale Rd Bridge Construction
  • Edithvale Station Tanking Slab Construction

Edithvale Rd Level Crossing Removal Project, Edithvale, VIC

Southern Program Alliance - Acciona

  • Construction of >600 Lin m of retaining wall capping beam
  • Backwash Tank and Interstage Pump Station Structure (>2800m2 wall formwork, >5m high, >1500m3 of structural, >350 tonnes of steel reinforcement)
  • Construction of more than 500 Lin m of retaining wall capping beam in the Station area of the Project
  • Pile caps for the Pedestrian Bridge
  • Edithvale Rd Bridge Construction
  • Edithvale Station Tanking Slab Construction

Cherry St Level Crossing Removal Project, Werribee, VIC

Southern Program Alliance - Acciona

  • Construction of the off structure barrier foundations on both the Southern and Northern side of the bridge
  • Installation of more than 115 precast OSB barriers
  • Formwork reinforcement and concrete placement of more than 700 Lin m of barrier stitch
  • SM2 kerb, footpath and other finishing works

Intake Sub Substation Scope for the Melbourne Metro Tunnel Project, North Melbourne, VIC

Cross Yarra Partnership (CYP)

  • Construction of the in ground HV pits
  • Ground slabs, including Transformer Plinths / Bunds Walls and Access Stairs
  • Miscellaneous Ground Slabs

Old Geelong Rd Level Crossing Removal Project, Hoppers Crossing, VIC

Western Program Alliance – McConnell Dowell

  • Formwork, reinforcement and concrete placement, on the North and South Service Protection Slabs
  • Construction of the off structure barrier foundations at the Southern Abutment (additional scope that was awarded to the Ausform business as a Variation, and on the back of good results that were being achieved with the WPA (McConnell Dowell)
  • Construction of the off structure barrier foundations at the Northern Abutment, including barrier installation and stitch (additional scope that was awarded to the Ausform business as a Variation, and on the back of good results that were being achieved with the WPA (McConnell Dowell)
  • SM2 kerb and infill concrete on top of structural foundations

Bell to Moreland Level Crossing Removal Project, Coburg, VIC

North Western Program Alliance - JHG

  • South abutment, including lower deflection walls and upper deflection walls
  • South abutment retaining wall foundations
  • Installation of retaining wall panels, and associated in in situ stitch
  • Installation of abutment facia panels
  • Trident stair foundations

Grant St SPS and Emergency Storage Tank, Bacchus Marsh

Jaydo for Western Water

Construction of 8m deep wet well, and Emergency storage tank

Mentone Station, Mentone, VIC

Southern Program Alliance - Acciona

Mentone Station platform foundations and platforms

Boneo WRP, Boneo, VIC

JHSB JV

Construction of several major water retaining structures including;
  • Primary Settlement Tank
  • Anoxic Tank
  • Inlet Works Structure
  • Clarifying (round tank)
  • Sludge Mixing Tank
  • Thickened Sludge Tank
  • Digester Tank Base x 2 No.
  • Other miscellaneous structures
The Projects included more than >6000m2 of wall formwork, >700 tonnes of steel reinforcement and >2000m3 of structural concrete

Craigieburn Sewerage Transfer Hub Project, Craigieburn, VIC

CPB Contractors Pty Limited/Yarra Valley Water

Construct concrete works for multiple structures including; 16m high Pump Station, 14m high Drop Structure, 800m2 inlet structure (171 lm inlet channel), complex Amaroo Terminal Manhole, Emergency Relief Structure and 2 no. 50m dia tank bases.
Works included;
  • design and fabricate complex custom formwork solutions;
  • develop and implement innovative ways of working at height to meet a very tight program
  • develop and implement innovative ways for constructing tall walls with tall lifts
  • develop and implement innovative ways to tie reinforcing steel with a rate 440kg’s/m3 with complex design,
  • 8000m3 of concrete
  • place 2000 tonnes of reinforced steel

Taralga Windfarm, Taralga NSW

Downer EDI Engineering Power Pty Ltd.

Construction of 51 no. Wind Turbine Foundations and Sub Station infrastructure valued at approx. $4.5m

Bendigo WTP Upgrade, Bendigo Vic

Aquatec Maxcon Pty Ltd.

Structural Concrete Works - Oxidation Tank, Reclaimed Water Tank & Bypass Pit valued at approx $730,000

Numurkah Water Treatment Plant Upgrade, Numurkah, Victoria

Laurie Curran Water.

Supply and construct filtration tank valued at approx. $600,000

Nagambie Clear Water Storage Tank, Nagambie, Victoria

Simpson Construction.

Design & Construct of Nagambie 3ML Clear Storage Tank valued at approx. $700,000

Bendigo Hospital Water Tank Compound, Bendigo, Victoria

Lend Lease.

Construction of retaining walls and tank bases valued at $200,000

Chepstowe Wind Farm, Chepstowe, Victoria

Consolidate Power Projects.

Construction of the 3 no. wind turbine bases valued at approx. $800,000

Bendigo Hospital Hotel, Bendigo Victoria

Hickory Group

Construction of foundation, stairwells and suspended slabs. Valued at approx. $645,000

Mount Mercer Wind Farm Project, Mount Mercer, VIC

Meridian Energy/Downer Engineering/RE Power

Construction of a small bridge structure, 64 No. Wind Turbine Foundations and Sub Station infrastructure valued at approx. $9.5M

Bendigo Terminal Station Upgrade Project, Bendigo VIC

SP Ausnet/United Group Limited

Construction of power related infrastructure, inside a live SP Ausnet Terminal Station

Broken River Rail Bridge Substructure Replacement, Shepparton, VIC

Victrack/Coleman Rail

Construction of 22 No. new circular columns for a bridge strengthening Project (between 2m and 9m in height)

Ranger Mine Brine Concentrator Project, Jabiru NT

Rio Tinto (ERA)/Hatch/Downer Australia

Delivery of $3.5M structural concrete works associated with the power station and utilities areas and the Brine Concentrator and Process Water Plant.

Koondrook Perricoota Flood Enhancement Project, Barham, NSW

Fulton Hogan and the State Water (NSW)

Construction of 3 No. Regulator Structures, with a total Contract Value exceeding $3.5M

Bacchus Marsh Recycled Water Plant, Bacchus Marsh, VIC

Western Water/Maxtra Infrastructure

Construction of a new Inlet Works and Lagoon Outlet Structure

Bendigo Multi Story Car Park Project, Bendigo VIC

Bendigo City Council/H Troon

Constructing the $5M+ reinforcement concrete super structure

La Trobe Rural Health School: Part 2, Bendigo VIC

La Trobe University/Kane Constructions

Constructing a complex three story building and associated works � Contract Value approx. $1.9M

George Weston Foods Site Extension, Castlemaine VIC

GWF/Wiley & Co.

More than 12 months worth of structural concrete works on the George Weston Foods Upgrade Project in Castlemaine

Nagambie Bypass Project, Nagambie VIC

Vicroads/Abi Group Contractors

Construction of a twin bridge structure, centre pile cap/pier/cross head, two additional bridge abutments, more than 20 No. end post barriers and works adjacent to a live railway line

Victorian Desalination Project, Wonthaggi VIC

Victorian Government/Thiess Degremont Joint Venture

Ausform Pty Ltd currently hold the largest value sub-contract (approximately $16M) for structural concrete works on the $5 billion Project located at Wonthaggi in Victoria�s South East.

East Goulburn Main Channel Off-Take Structure

Goulburn Murray Water/Future Flow/Geotechnical Engineering Pty Ltd

Construction of the East Goulburn Main Channel Off Tank Structure undertaken during the irrigation season shut down. A tight construction program, delivered ahead of time

Goldfields Super Pipe Project

Central Highlands Water/CCB Envico

Construction of 3 No. circular water holding tanks and associated pump station buildings

New Calder Freeway

Vic Roads/John Holland/Winslow Projects/Thiess

Construction of Five (5 No.) bridge structures on the New Calder Freeway between Carlsruhe and Harcourt North.

Bendigo Recycled Water Plant Upgrade (Epsom)

Coliban Water/CCB Envico

Construction of the Bendigo Recycled Water Plant Upgrade (Epsom) with works including the Chlorine Contact Tank, Recycled Water Wet Well, Low Lift Pump Station and Final Water Tank.

Bendigo Water Treatment Plant (Aqua 2000 Project)

Walter Construction Group./Coliban Water

Construction of the $80M Bendigo Water Treatment Plant (Aqua 2000 Project).

Bendigo Gold Project

Bendigo Mining Ltd/Ausenco Ltd

Construction of the $115M Bendigo Gold Project.

Fosterville Gold Mine Project

Northgate Minerals

Construction of the $90M Fosterville Gold Mine Project for Cullen Mining Services (mine now in operation by Northgate Minerals)

Numurkah Water Treatment Plant

Goulburn Valley Water/Simpson Construction Company

Design and Construction of a 3ML Round Clear Water Storage Tank at the Numurkah Water Treatment Plant.

Koorlong Waste Water Treatment Plant

Lower Murray Water/Fulton Hogan

Construct the $35M Koorlong Waste Water Treatment Plant, including a 120m long x 60m wide x 6m high SBR Tank and 8 other major miscellaneous RC structures.

Robinvale Pump Station Project

Lower Murray Water/Fulton Hogan

Construction of the $10M Robinvale Pump Station Project, including 30m long x 18m wide x 6m high pump station structure (ground water retaining)

Woodend Recycled Water Plant Upgrade

Western Water/Simpson Construction Company

Construct the $6M Woodend Recycled Water Plant Upgrade including a 31m long x 19m wide x 5m high recycled water tank (water retaining)

Pedestrian Rail Bridge

Victrack/Fulton Hogan

Construct the $3M Pedestrian Rail Bridge at Wandong

Sheahan Bridge Duplication

RTA/Fulton Hogan

Construction of the Sheahan Bridge in Gundagai. A 1.2km length bridge across the Murrumbidgee River Flood Plains.

Fosterville Gold Mine Upgrade

Northgate Minerals

Construction of the Heated Leach Facility at the Fosterville Gold Mine.

Colligen Creek Weir and Fishway Upgrade Project

State Water (NSW)/Gleeson Excavations

Construct the Colligen Creek Weir and Fishway Refurbishment


 

To whom it may concern,

Ausform were engaged to carryout structural concrete works at three concrete regulators within the Koondrook Perricoota Forest Flood Enhancement Works Project. During this time I worked with them in my role as the Project Engineer overseeing the works.

While on site they worked hand in hand with our team, our engineers and other trades to ensure a quality product was delivered and made sure that key schedule milestones were achieved.

Their wide range of concrete services and capabilities combined with the extensive experience of their work crews makes them a highly desirable contractor for any formwork and/or concrete placement works.

Ausform would be an asset to any company that engages them and I have absolutely no problem recommending them.

Yours sincerely
David Ferronato
Project Engineer / Fulton Hogan
Koondrook Perricoota Forest Flood Enhancement Works Project

To whom it may concern,

Downer engaged Ausform Pty Ltd in May 2012 to deliver all concrete works associated with the Ranger Brine Concentrator Project. The contract value was approximately $3.5m with Downer holding the major subcontracts to supply concrete, steel, survey and geotechnical requirements. Downer are delivering the project for ERA Major Projects at the Ranger Uranium Mine in Jabiru (NT).

The project has been substantially fast tracked to complete the civil and concrete works prior to the Northern Territory wet season and Ausform have demonstrated an ability to mobilise an enthusiastic and technically competent team to match up with the manning requirements of the project. Ausform also accommodated a partial team demobilisation following initial site mobilisation due to unscoped earthworks causing delays to the concrete commencement dates with minimal commercial impact.

The compact construction site and extreme weather conditions provided challenging work environment and Downer found the work ethic of the Ausform team to be outstanding. Their attitudes to safety and quality aligned with Downer's during the project delivery and their workscope was delivered with 0 LTI's and minimal quality non-conformances.

The supervision team led by Matt Carkeek and Clint Johnson worked closely with the Downer Management Team to ensure that all contract deliverables were met. Unusually Company Director Brian Loughnane practices a hands on approach demonstrating the standards and attention to detail he expects from his team while working side by side on the tools with them. This approach appeared to work well onsite.

Commercially we found Ausform to be transparent and fair and importantly on top of all their contract administration commitments. Ausform were willing to take on the majority of the works on a schedule of rates basis ensuring that Downer and Ausform were aligned from a contractual perspective. This ensured a close working relationship through the duration of the works.

I would be happy to work with Ausform on future works.

Yours sincerely,
Nat Hickcox
Project Director
Ranger Brine Concentrator Project
0408 343 647

To whom it may concern,

Ausform was engaged as part of H.Troon's team to complete the construction of the new 5 level Bendigo Multi Storey car Park. Ausform was awarded the contract to complete the $5.5 million concrete superstructure. From the very start H.Troon found Ausform to be very professional in the way they carried out their business, and the was maintained for the complete duration of the project. Ausform were given a program to work to, of which Ausform's standard of finish and workmanship to be of the utmost standard, and appreciate their problem solving abilities when it came to finding a solution that works. They completed all works with a full focus on OHS and ensured all safety standards were met. H.Troon enjoyed thoroughly the relationship that was built throughout this project with Ausform and would fully recommend the Ausform for future works.

Yours Faithfully,
James Troon
Project Manager / H. Troon Pty Ltd

To whom it may concern,

I'd like to thank the Ausform team for the commitment to delivering their scope of works which included a complete bridge (Racecourse Road), two bridge abutments and a centre pier which are part of the Nagambie Bypass Project. Ausform's commitment to quality and safety was excellent with the final product completed ahead of time.

Scott Brown
Ph: 0410 431 069
Senior Project Engineer / Abigroup Contractors Pty Limited

To whom it may concern,

I have recently been involved in the Construction of the Victorian Desalination Project. My responsibilities were overseeing works in the Pre-treatment area, including footings; walls tanks;. Suspended decks; the structural steel superstructure, Pre-cast tilt panels and the Green Environmental roof.

Ausform were awarded a portion of this work as a lump sum contract and also carried out a significant amount of on an hourly rate agreement. I found Ausform a pleasure to work with, their organisation within the company, their Planning and Safety Management was always of a high standard and they were an asset to the Thiess/Degremont Project during their time on site under difficult conditions.

They were supervised onsite by Matthew Carkeek and Clint Johnson both of whom led by example and displayed a considerable amount of knowledge and willingness to help us achieve the goals set by management. Regular visits to site by the Company Director, Brian Loughnane also assisted us in achieving our goals, by providing additional technical support and organising fabrication of equipment offsite to fast track progress. Ausform's accounting system was always accurate and processed promptly with clear details of every employee's activities daily. At all times, Ausform had an honest approach to the work performed.

However, after over 12 months onsite they had completed their contract work and unfortunately decided to return to Bendigo to carry out other contracts awarded to them. We certainly missed their expertise and attitude when they left.

I would not hesitate to recommend Ausform for any future work.

Laurie Bush
Ph: 0437 483 246
Superintendent Civil, Pre-Treatment

Wiley would like to thank Ausform Pty Ltd for their outstanding efforts on the George Western Foods, Castlemaine, Processing Plant Upgrade.

The concrete contract we agreed on, was a mixture of fixed contract lump sum and also agreed hourly rates on the more difficult work. This approach worked well for both parties. The total contract for the concrete work ended up at approx 2.5million.

Ausform's reliability to man-up when needed, quality of finish, attention to detail (which is very important in a food processing plant) was outstanding.

The nature of some areas of this project required intricate planning and night shift work to fit in with the client's requirements. All this work was achieved in the timeframes and to a very high standard of finish, with no planned disruption to our client. We could not have asked for a better result, due in no smart part to Ausform's efforts

Wiley would recommend Ausform for any work in Victoria and would be more than happy to use them again on future projects

Brent Allen
Project Manager
ph: 61 7 3859 8840
e:
brent.allen@wirley.com.au

To whom it may concern,

Ausform Pty Ltd have been working for Thiess Degremont Joint Venture on the Victorian Desalination Project since February 2010. They currently hold the largest value structural concrete placement subcontract package on the project, an approximate value of $14M. To date their work and their work ethic has been excellent, which has resulted in them picking up much more work on the project than they had originally submitted a tender for. Their specialist knowledge of water retaining structures in particular has been invaluable on this project. I have no hesitation in recommending them and would be happy to answer any further inquiries.

Regards,
Joel Gabauer
Project Engineer / Thiess Pty Ltd

To whom it may concern,

Ausform has been working the past 7 months for Fulton Hogan on the Robinvale pump station and Koorlong Waste Water Treatment plant in Mildura. Value of works was approximately $7 million. Works are nearing completion. The works undertaken by Ausform are of a very high quality and the cooperation with the Ausform management team has been good and I can recommend them for any concrete / formwork works. Safety standard of compliance was high and no MTI / LTI was recorded. I am happy to discuss the above with anybody who is interested.

Regards,
Eric Waters / Senior Project Manager / Fulton Hogan Pty Ltd

Ausform's Scope of works included the following:

  • The Design & Construct of a 500KL (20m DIA) Concrete Reclaimed Wash Water Tank
  • Design & Construct of a 22m L Cantilevered Concrete Retaining Wall
  • Construction of a 22m L x 11m W x 7m H Concrete Oxidation Tank
  • Construction of a 6m L x 4m W x 6m D Bypass Pit including mass concrete pipe supports
  • Construction of a concrete slab for a 60T Lime Silo & delivery truck delivery area.
  • Other miscellaneous concrete slabs & footings.

Ausform's Site Supervision was well organised & works were completed on time & within price quoted. Personnel performed well, were well trained & knew what needed to be done & also provided construction input where required.

There were no MTI's or LTI's & was a result of Ausform's diligence concerning site & site safety management.

Overall Ausform's performance was excellent & Aquatec Maxcon would not hesitate to use Ausform again on future projects & highly recommended them for other projects.

Kind Regards
Darren McCarthy
AQM Senior Project Manager for the BWTP Upgrade

Please accept my thanks on the successful completion of the works at Chepstowe Wind farm.

Reports from site and from my client and engineers were that your workmanship and professionalism were of a very high standard.

The concrete pours seemed to run very smoothly and without incident.

We hope we can work with you in the near future. I will be in contact with both of you to close project out and pass on my thanks personally.

Regards
Dimitrios Belegris

Ausform are my 'go to' contractor for reinforced concrete structures. I have had a number of good experiences with Ausform whose 'straight bat' culture comes from the values of the management team. Ausform gives me certainty of quality delivery. They have always provided innovation in design and construction smarts and the best win-win results have happened when they have been treated as a true and valued partner in the project

Paul Varrasso ex FH Chief Estimator and Leighton Civil Senior Estimator.

Re MMWF Fire Wall
Brian,

In reference to the pouring of the fire wall.
As we know there was a bit of controversy as to the structural integrity of the wall and the subsequent pouring procedures. Upon observing the diligence Ausform displayed in the way the wall was constructed and the work practices implemented to complete the wall, including pouring, I would just like to take this opportunity to say that it is pleasing to work with a company that shows a level of professionalism, and safety, projects should strive to achieve.

Regards,
Jason Grant / Zero Harm Safety Advisor
Downer Engineering Power

We note our appreciation of Ausform's work on the recently completed project.
We found your Company excellent to deal with including your professionalism and workmanship - site issues were extremely limited and I believe the finished product bears reflection of that - given the opportunity, I would be more than happy to deal with your Company again.

Director, Geotechnical Engineering Pty. Ltd.

Main slab has been complete.

Great job by Ausform yesterday in terrible rainy conditions.
We are now going through the boiler slab with J.Mconie and Daniel from Ausform to have complete by late January.

Cheers,
Troy Boyles
Surface Maintenance Superintendent / Northgate